Building within 3 metres of a public sewer needs a build over agreement from the water company, with drawings showing how the sewer is protected. Miss it, and building control cannot sign the works off.
- Sewer location check at design stage
- Foundation design respecting the asset
- Build over application and drawings
- Approval coordinated with building control
How do I know if a sewer crosses my garden? +
Water company asset maps show public sewers, and since 2011 many formerly private drains are public. We obtain and interpret the records for your site.
How long does a build over agreement take? +
Straightforward self-certified cases are quick; approved agreements typically take a few weeks. We build it into the programme so it never becomes the critical path.